Fengfan 898A is a white alkaline powder that dissolves in water to build the cleaning bath at the head of a metal plating process. Parts arrive carrying drawing oils, cutting fluid and storage grease; they leave with a surface the rinse water wets evenly, ready for derusting, activation and the plating tank. The blend contains no phosphorus, so the phosphate load that discharge permits usually cap does not enter your wastewater from this stage.
Steel and iron are the main workload — stampings, machined components, welded fabrications, fasteners and tube — and copper parts such as busbars, terminals and connectors run through the same bath. Lines that feed an electroless plating process are among the most demanding users, because that chemistry punishes any trace of oil with adhesion failures that only appear once the parts are finished.
In practice one tank replaces two things a finishing shop often runs side by side: a solvent wipe for oily stock and a hot soak cleaner for everything else. One powder, one bath and one set of rinse stages cover both, and steel and copper work can follow each other without a changeover.

Why the phosphorus is left out. Phosphorus is the builder most degreasing powders are designed around, and it is also what decides how much of a wastewater budget the cleaning stage consumes. It is a nutrient: once it reaches a drain or a watercourse it feeds algae, which is why discharge limits in most industrial markets put a cap on it. This degreaser is formulated without it. The bath still lifts oil, because the detergency comes from the alkaline builders and surfactants in the blend, but the phosphorus arriving at your treatment plant no longer comes from this tank, and the phosphate sediment that collects in tanks and pipework does not form.
What the alkaline bath actually does. Alkaline chemistry works on oil in two ways. It saponifies fatty and ester-based oils outright, turning them into something the rinse will carry away, and it breaks the surface tension that holds mineral oil on steel so the oil lifts and stays dispersed instead of settling back on the work. That second part is what keeps a bath usable as it loads up: a shop running the same tank all week needs the oil held in suspension, not floating back onto the next rack. Among the pretreatment plating chemicals in a line, this is also one of the simpler ones to control — a concentration, a temperature and a contact time, with no balance of several additives to chase.
Bath life. Because the alkalinity is not consumed by acidic oil carry-in the way an acid cleaner would be, the bath is maintained by top-up rather than by constant replacement, and with no phosphate in the blend there is no phosphate scale to chip out of the tank. Fewer dumps mean less downtime and fewer litres to treat. A degreasing stage that holds its strength also keeps the plating process downstream far more consistent, because the substrate going into the plating tank is the same on Friday as it was on Monday.
| Property | Specification |
|---|---|
| Product | Fengfan 898A metal pretreatment degreasing agent |
| Appearance | White powder |
| Solubility | Dissolves fully in water to build the working bath |
| Chemistry | Alkaline, phosphorus-free |
| Parts cleaned | Steel, iron and copper components |
| Working concentration | 50–80 g/L |
| Bath temperature | 15–50 °C |
| Contact time | 5–20 minutes |
| Cleaning methods | Immersion, ultrasonic, spray |
| Typical consumption | 200–300 m²/kg |
| Line compatibility | Batch and continuous degreasing lines |
| Handling classification | Non-poisonous, incombustible and non-explosive powder |
Heat only what the line needs. The bath works from ambient temperature upward, so a shop without a heated tank can still run it, and a shop with warm rinse water already in the line can often use a heat exchanger it already owns. Running cool costs nothing in energy; running warm shortens the cycle. That trade-off is the main lever on a steel plating line, where the cleaning stage is usually the first thing to become a bottleneck when line speed goes up. Freshly machined parts with light cutting oil clear quickly; parts carrying hardened drawing lubricant or storage wax take longer, and the answer is temperature and time rather than more powder.
Maintenance by top-up, not by rebuild. The bath stays alive by adding powder against consumption and by skimming the oil that floats to the surface. Neither job needs a technician, and neither stops production. Because consumption is quoted per square metre of work, the cost of the stage can be calculated before a job is quoted, which is more useful on a metal plating process than a price per drum. Short cycles matter too, because this stage sits in front of every other step: a degreaser that needs a long soak sets the pace for the whole shift.
Less rework downstream. Almost every adhesion failure, blister and patchy deposit traced back through a line ends at the cleaning stage. A bath that is skimmed and topped up properly removes the most expensive kind of defect — the one found after plating, when the part has to be stripped and run again. Lines running an electroless plating process are the least forgiving of the lot, because an organic film that a zinc bath would tolerate shows up there as haze or poor adhesion, and by then the part has been through the entire line. Fewer re-plates also mean less chemical consumed per good part, so the saving shows up twice.

Choosing the right match is where most sourcing decisions stall. As a trading supplier, we keep one point of contact from first enquiry to after-sales: tell us what you are making and the conditions you work under, and we shortlist the closest matches from our supplier network, compare specifications and arrange samples before you commit to a bulk order. If something does not behave as expected, we work with the supplying partner on the cause and a practical fix, and stay with the case until it is settled. Email, WeChat or WhatsApp enquiries get a reply within 24 hours.
Steel and iron are the core workload — stampings, machined parts, welded fabrications, fasteners and tube — and copper parts such as busbars and terminals go through the same bath. That is the kind of mixed load a general metal plating shop handles in a week. Aluminium and aluminium-alloy parts take a different non-phosphorus grade from the same family, so tell us the substrate when you enquire and we will point you to the right one.
All three work. Immersion is the most common because it is the easiest to control; ultrasonic tanks reach blind holes and threads that a dip leaves wet with oil; spray washers suit large fabrications that will not fit a tank. Plenty of plants providing metal plating services combine two of them — a dip followed by a spray rinse, for example — and the powder is the same in each case.
Anywhere from ambient to comfortably warm, and that choice is a trade-off rather than a fixed rule. The warmer the bath, the faster it works, so a line that needs a short cycle runs warmer; a shop with heat-sensitive parts or no tank heating runs cooler and gives the parts longer. Heavy, hardened oil wants both the warmer end and more time. In a high-throughput plating process the usual answer is to run warm and keep the contact time short.
Work the first charge out from the tank volume and the working concentration, then top up against consumption as you run. How far a kilogram goes depends on how oily the work is, how warm the bath runs and how long the parts stay in the tank — a heavy draw with thick drawing lubricant can use several times what a clean machined part does. Treat the quoted consumption as a planning number for a typical industrial metal plating workload rather than a fixed rate.
It is the first wet step, so it sits ahead of whatever comes next: zinc, copper, nickel, chrome, alloy, and paint or powder coating. What changes downstream is the rinse discipline, not the degreasing. A metal plating process that is sensitive to organics, bright nickel for instance, will show a poor degrease very quickly as haze or adhesion loss, which actually makes the cleaning stage easy to monitor.
Skim the surface at the end of every shift, and do not rely on extra powder to rescue a saturated bath — past a point the solution cannot hold more oil and it starts redepositing on the work. When the bath is heavily contaminated, dump it and make a fresh one. On a busy steel plating line that is a routine scheduled job, not an emergency.
An alkaline cleaner has to rinse clear, and that is a rinse-stage question as much as a bath question: two stages, or counter-flow, and a final rinse that leaves the parts clean. Lines feeding an electroless plating process are the strictest test, because that bath will not tolerate organic carry-over; if you see haze or adhesion problems there, check the rinse before you change the degreaser.