Description

Product Overview

This is a brightener for sulfate zinc plating, the acid zinc family built on zinc sulfate and boric acid rather than on caustic soda. In the tank it governs how the zinc grains grow: dosed correctly it produces a deposit that is smooth, bright and well levelled, and it holds that finish from the first part of a shift to the last. Wire galvanizing is the classic home of this metal plating process, but the brightener is just as much at home on a rack line where parts are plated one load at a time. We supply it together with the zinc sulfate and the boric acid as one package of acid zinc plating chemicals, so a tank can be charged from a single order instead of being pieced together from several sources. The formulation is deliberately short, which makes the bath quick to analyse, easy to hand over between shifts, and simple to correct when a number drifts out of band.

Product Details

  • Product model: SZ-30B
  • Product type: sulfate zinc plating brightener for acid zinc baths, supplied with its own make-up and operating envelope
  • Key properties: stable performance and high current efficiency, with a smooth, bright and levelling zinc deposit that holds across a production run
  • Suitable applications: continuous zinc plating and single-workpiece plating in sulfate zinc electroplating processes, on wire lines as well as rack and barrel work

Technical Formulation & Operating Conditions

ItemOperating RangeStandard Value
Zinc sulfate (ZnSO₄·7H₂O)350–450 g/L450 g/L
Boric acid (H₃BO₃)25–35 g/L30 g/L
SZ-30B brightener20–30 ml/L25 ml/L
pH2.5–3.53.0
Temperature10–50 °C15–35 °C
Cathode current efficiency>95%>95%
AnodeNo. 0 zinc ingotNo. 0 zinc ingot

Sulfate Zinc Plating Bath Preparation

  1. Start with a clean, lined tank and fill it to about two thirds of the working volume with water. Bring the water up to the standard operating temperature before any salt goes in — zinc sulfate dissolves far faster warm, and the brightener should never meet a cold bath.
  2. Add the zinc sulfate first and agitate until the solution is completely clear. Undissolved crystal that settles near the anode area sits there and shows up later as rough, gritty deposits nobody can explain.
  3. Add the boric acid slowly with the agitation still running. It dissolves more slowly than the zinc sulfate, and if it is tipped in as a heap it cakes on the tank bottom and the buffer never reaches its working strength.
  4. Check pH on a calibrated meter and bring it towards the working band with dilute sulfuric acid, adding in small portions and reading again after each one. Overshooting and coming back is slower than walking the value down.
  5. Measure the brightener by volume and add it last, with circulation running, so it is evenly distributed before the first load enters the tank.
  6. Check anode contact and anode area, then start the plating process on scrap or non-critical work. If brightness or levelling is not there on that first load, correct the bath before production parts go anywhere near it.
  7. Write down the make-up quantities, the batch number on the drum and the pH you actually measured. That first log becomes the reference every later correction is judged against.

Product Advantages

  • A finish that needs less afterwork: the deposit comes off the bath smooth, bright and levelled, so polishing or buffing can be cut back or dropped on parts where appearance is the acceptance criterion.
  • Current that goes into the deposit: cathode current efficiency is high, which means a given current density builds zinc faster and less of the energy is spent making hydrogen at the cathode.
  • A temperature window that tolerates a real workshop: the bath runs from a cool morning through to a warm afternoon, and the standard band sits comfortably inside the wider range, so brightness does not collapse while a cooling loop is struggling.
  • Levelling that helps on awkward geometry: recesses and edges that normally show a brightness difference across the same part come out more even, which cuts sorting and rework at the end of the line.
  • Analysis a shift chemist can finish quickly: with only the zinc sulfate, the boric acid and the brightener to track, the bath is titrated and corrected in minutes rather than in half a shift.
  • No exotic line hardware: a lined tank, No. 0 zinc ingot anodes, filtration and a rectifier are the essentials, so the bath fits an ordinary electroplating line without a rebuild.

Continuous Wire Plating Reference Data

ParameterReference value
Wire diameter up to 1 mm — running speed10–30 m/min
Wire diameter up to 1 mm — current intensity per wire rod20–80 A
Wire diameter up to 2.5 mm — running speed7–20 m/min
Wire diameter up to 2.5 mm — current intensity per wire rod120–350 A
Wire diameter up to 5 mm — running speed5–10 m/min
Wire diameter up to 5 mm — current intensity per wire rod200–500 A
Largest wire diameter covered by this data5 mm
Running speed expressed asMetres of wire travel per minute through the bath
Current intensity expressed asAmperes applied to a single wire rod
Adjustment variablesWire diameter, line speed, bath condition and the plating result required

Continuous Wire Plating

A wire line is judged on the coil, not on a test panel, and the settings that produce a good coil come from diameter, line speed and current together rather than from a single recipe. The reference table gives the bands to start from; expect to trim them for your line geometry, your bath age and the finish your customer asks for. Set current against wire diameter before you touch line speed. A thin wire and a heavy rod do not take anything like the same current, and pushing a thin wire towards a heavy-rod current burns the deposit and leaves it brittle. Match anode area to the load as well: a heavy wire order pulls a large current, so check anode bags, anode area and contact bars before the line speed goes up. Drag-out is the quiet variable on a continuous line. Wire carries bath out of the tank all shift, so volume and concentration fall steadily; build the top-up into the routine instead of reacting to a dull patch at the end of the run. Keep the entry clean as well — drawing lubricant or grease carried into the bath shows up as bare patches and poor adhesion, and no addition will fix a cleaning problem on an electroplating line.

Process Adjustment & Routine Control

  1. pH first, every shift: read it on a calibrated meter at working temperature and correct with dilute sulfuric acid. pH creep is the most common single reason a bath that was fine last week starts producing dull work.
  2. Zinc sulfate next: check the concentration by titration or density and top up towards the standard figure instead of waiting for the deposit to look thin.
  3. Boric acid: keep it inside its band. When the buffer falls low, pH swings between checks instead of holding, and burning at high current density is the first symptom you will see.
  4. Brightener by result, not by habit: judge it on a Hull cell or a test panel and add in small increments, because over-addition is harder to correct than under-addition.
  5. Temperature: log it at the same times each day so a slow drift from a tired chiller or a hot spell reads as a trend rather than arriving as a surprise batch.
  6. Contamination: iron and copper reach a sulfate bath through drag-in and through parts that fall in. Filter continuously and watch the bath colour; a metal plating process that ignores contamination will keep chasing brightness with additive it does not need.
  7. Anodes and bags: inspect weekly for passivation, sludge and bag damage. A bagged No. 0 zinc ingot anode that has stopped working shows up as a current that will not climb, which is one of the classic faults in the process of electroplating.
  8. Keep a written log of pH, temperature, additions, Hull cell result and appearance. A bath drifts slowly, and the log shows the drift before the parts do.

Coating Appearance & Performance Checks

Brightness and levelling are judged on the part, not in the bath: the finished component is the only honest measure of the process of electroplating, and a panel kept from a known-good run is the cheapest instrument a plating shop owns. Pull a sample at the start of the shift and another after the bath has run for a few hours, and compare both against that panel. Thickness and corrosion performance depend on how the whole plating process is run, not on the brightener alone. The steel substrate, the deposit thickness you aim for and whatever passivation or sealing follows the zinc all move the result, which is why we do not publish a single salt spray figure for this product. Tell us the substrate, the thickness you target and the post-treatment you use, and we will agree the test method with you, so the number you pass to your own customer is one your line can reproduce. If appearance is the acceptance criterion, fix the light and the viewing angle and keep them the same every shift. Zinc brightness reads differently under a sodium lamp and under daylight, and a fair share of arguments about a dull batch turn out to be arguments about the light.

Use Scenarios

  • Wire galvanizing lines: fencing wire, welded mesh and drawn wire run continuously through a sulfate bath, and the coil has to come off the line bright because there is no polishing step after it.
  • Rack and barrel work in a job shop: brackets, fasteners and simple steel components plated a load at a time, where one bath has to cover a mixed order book without a change of additive.
  • Bringing a working bath back: a sulfate tank that has gone dull after a quiet period is normally recovered with a brightener addition and a pH correction long before anything more drastic is considered.
  • Commissioning a new tank: because the salt figures, the anode specification and the brightener come from one supplier, a line being started up can order its acid zinc plating chemicals together and charge the bath from one set of documents.
  • Captive plating departments: factories plating their own parts for assembly rather than for resale keep a sulfate line because it is simple to control and does not need a dedicated chemical engineer on shift.

Handling, Storage & Documentation

The brightener is supplied as an additive in drums. Keep containers closed and under cover, off direct sunlight and away from strong oxidisers, and stand them off the floor so a damp store does not corrode the base of the drum. Acid sulfate baths are handled like any other electroplating chemistry on site: eye protection, acid-resistant gloves and an apron for decanting, and a bund or tray under the drum while it is being tapped. Read the safety data sheet and the drum label before the first drum is opened. If you need a copy for your own records or for a customer audit, ask your sales contact and we will send the current version for the batch you have received. Write the batch number from the label into your bath log. If a question comes up later about a delivery — a colour difference, a slower response than you expected — that number is what lets us trace the batch, compare it with what else went out at the same time and give you an answer instead of a guess.

Ordering, Packing & Delivery

  • Payment: 100% T/T in advance.
  • Minimum order quantity: varies by chemical; confirmed with our sales team per order.
  • Lead time: 2 weeks.
  • Packing: 10 kg/box; 25 kg or 50 kg/bag; 20 kg/25 kg/30 kg/200 kg/drum; 1000 kg/IBC drum.
  • Shipping: per the terms agreed in the current contract.
  • Warranty: inspection certificate issued after delivery stating the batch number and warranty period.
  • Trial quantity: if you want to run a small trial before committing to a full drum, ask your sales contact about sample availability and the current terms.

Contact Fengfan

Technical questions about a running bath are answered by the team that supplies the brightener. When you write, tell us where in the plating process the problem appears — brightness, adhesion, coverage in a recess, a current that will not climb — and add the bath volume, the type of line you run (wire, rack or barrel), the substrate and your destination. Those details are usually enough for a useful answer on the first reply rather than a round of questions. If you are planning a new tank or changing an existing bath, send the make-up and the operating figures you run today. We will set them against the standard values for this product and tell you what to move, which is a much shorter conversation than a metal plating process rebuilt by trial and error.

Technical Support & Model Matching

Choosing the right match is where most sourcing decisions stall. As a trading supplier, we keep one point of contact from first enquiry to after-sales: tell us what you are making and the conditions you work under, and we shortlist the closest matches from our supplier network, compare specifications and arrange samples before you commit to a bulk order. If something does not behave as expected, we work with the supplying partner on the cause and a practical fix, and stay with the case until it is settled. Email, WeChat or WhatsApp enquiries get a reply within 24 hours.

FAQ

What plating system is this brightener used for?

It is made for sulfate zinc plating: a bath built on zinc sulfate as the metal source and boric acid as the buffer, running on the acid side. It is not intended for alkaline zinc or for chloride zinc systems, which use different addition agents and hold a different pH.

What brightener concentration should I run?

The working range is 20–30 ml/L, with 25 ml/L as the standard figure. Start at the standard value on a new bath, judge the result on a test panel, and add in small increments rather than jumping straight to the top of the range.

What pH and temperature should I maintain?

Hold pH between 2.5 and 3.5, with 3.0 as the standard. The bath works between 10 °C and 50 °C, and the standard operating band is 15–35 °C. The wider range is there for cold mornings and warm afternoons, not as a target to run at.

Which anode is recommended?

No. 0 zinc ingot. Keep anode area and contact bars in good order as well, because a sulfate bath with a lazy anode shows up as a current that will not reach its set point and a deposit that loses brightness at the far end of the rack.

Can it be used for continuous wire plating?

Yes. Reference running speed and current intensity values are published for wire diameters up to 5 mm, and they are starting points: the final setting follows wire diameter, line speed, bath condition and the finish you need.

The deposit has gone dull — where should I look first?

Usually at the bath rather than at the brightener. Work through pH, temperature and zinc sulfate concentration before adding more additive, then check for iron or copper pick-up and for anode area. A plating process that has drifted will not be corrected by brightener alone, and over-addition makes the next correction harder.

Can I use it in a sulfate bath that already runs another supplier's additive?

Often yes, but it should not be a blind swap. Changing additive inside a running bath is one of the less forgiving moves in the process of electroplating, because old and new components can behave differently at the same concentration. Send us your current make-up and operating figures, and run a panel test before the production bath is changed over.

How do I keep the boric acid under control?

Analyse it on a fixed schedule rather than when something goes wrong. Boric acid is the buffer that holds pH steady; when it falls low, pH swings between checks and the deposit burns at high current density. Top up towards the standard figure and re-read pH after the addition.

Do you supply the zinc sulfate and boric acid as well?

Yes — the brightener sits in a range of acid zinc plating chemicals that includes the salts and the anode specification, so a new tank can be charged from one order. Tell us the bath volume and we will match the quantities to the make-up figures.

Is the zinc deposit suitable for passivation or sealing afterwards?

Sulfate zinc deposits are normally passivated or sealed after plating, and the finish from this brightener is smooth enough to take a routine post-treatment. Tell us which passivation system you use and we will confirm the sequence with you rather than assume it.

REQUEST MORE DETAILS

Please fill out the form below and click the button to request more information about
Name
Email *
Message
Verification Code *
Click to verify
Leave a message
Name
Email *
Message
Verification Code *
Click to verify